Skip to content

Interactive demo · Fictional data

NAVA operations

Thursday 29 October 2026

Maintenance

12 open issues across the signature homes. Completed work shows the actual cost. Everything else is still an estimate. Status changes are saved in this browser.

Pool pump noise

MediumIn Progress

Villa Ananda · Pool · Made Wirawan · reported 26 Oct

The pool pump developed a grinding noise after the evening cycle. Inspection found a worn impeller. A replacement is being fitted without draining the pool.

Estimate Rp1.8m

Actual —

AC bedroom 2

HighScheduled

Villa Ananda · AC · Wayan Sudiarta · reported 27 Oct

The bedroom 2 split unit cools for about twenty minutes, then the coil ices over. Wayan will service it tomorrow morning, before the next turn of guests in that room.

Estimate Rp950k

Actual —

Garden lighting

LowCompleted

Villa Ananda · Garden · Komang Darta · reported 12 Oct

Three path lights along the west lawn had failed. Replaced with the same warm fittings already used on the property.

Estimate Rp500k

Actual Rp420k

Living room AC not holding temperature

HighScheduled

Villa Amaya · AC · Wayan Sudiarta · reported 28 Oct

The in-house guest reported the living room unit short-cycling. Wayan is booked today at 14:00. The bedroom units are unaffected.

Estimate Rp1.2m

Actual —

Roof leak above bedroom 1

UrgentIn Progress

Villa Luma · Building · Made Wirawan · reported 22 Oct

Rain came through the bedroom 1 ceiling after the 21 October storm. A temporary cover is in place. Tiles and flashing are being replaced today.

Estimate Rp3.4m

Actual —

Water heater slow to recover

MediumReported

Villa Ombak · Plumbing · Rizky Halim · reported 28 Oct

The main heater needs a long recovery between showers. Rizky is confirming whether this is an element or a sizing issue before a quote goes to the owner.

Estimate Rp780k

Actual —

Gate motor slipping

MediumWaiting Approval

Villa Cendana · Building · Made Wirawan · reported 20 Oct

The street gate opens, then slips on the way down. The quote replaces the motor rather than repairing it a third time. Waiting on Marcus Hale.

Estimate Rp2.6m

Actual —

Unstable fibre connection

HighIn Progress

Villa Kalyana · Internet · Wayan Sudiarta · reported 18 Oct

Evenings drop for several minutes at a time. The provider has replaced the modem. A second line test is booked around today’s arrival.

Estimate Rp650k

Actual —

Dishwasher not draining

LowScheduled

Villa Aruna · Appliance · Rizky Halim · reported 25 Oct

The main kitchen dishwasher leaves a pool of water. A service visit is booked for 31 October, after this family checks out.

Estimate Rp1.1m

Actual —

Garden irrigation leak

LowCompleted

Villa Tirta · Garden · Komang Darta · reported 9 Oct

A lateral line in the lower garden was splitting. Replaced a six-metre section and reset the timer.

Estimate Rp700k

Actual Rp640k

Bedroom 3 lock stiff

MediumCompleted

Villa Nusa · Building · Made Wirawan · reported 14 Oct

The bedroom 3 lock was catching. Cylinder replaced and three spare keys cut for the key safe.

Estimate Rp350k

Actual Rp280k

Outdoor shower drainage

MediumWaiting Approval

Villa Senja · Plumbing · Made Wirawan · reported 17 Oct

The outdoor shower holds water after use. The quote lifts the tray and redoes the waste. Farah Malik has the approval in her portal.

Estimate Rp1.5m

Actual —

Kitchen fridge warming

LowReported

Villa Melati · Appliance · Rizky Halim · reported 27 Oct

The fridge is holding around 8°C. Food for the current guest was moved to a spare unit. A replacement quote is being prepared.

Estimate Rp2.2m

Actual —

Slow pool leak at the skimmer

HighIn Progress

Villa Cendana · Pool · Komang Darta · reported 15 Oct

The pool loses about a centimetre a day. Dye testing points at the skimmer throat. Repair continues around today’s checkout.

Estimate Rp3.1m

Actual —

Pool deck spotlight out

LowReported

Villa Sora · Electrical · Wayan Sudiarta · reported 29 Oct

One deck spotlight failed overnight. It is not a safety issue. Wayan will pair it with another Canggu visit this week.

Estimate Rp450k

Actual —